![ufc 3-310-04 ufc 3-310-04](https://img.yumpu.com/4333240/1/190x245/ufc-3-430-11-boiler-control-systems-the-whole-building-design-.jpg)
Unified Facilities Criteria (UFC) 3-310- 04. Whittier, CA: International Conference of Building Officials.Ĥ. More than 2 ufc 3 310 04 at pleasant prices up to 427 USD Fast and free worldwide shipping Frequent special offers and discounts up to 70 off for all.
#Ufc 3 310 04 code#
Building Code Requirements for Structural Concrete (ACI 318-05) and Commentary (ACI 318R- 05). American Concrete Institute (ACI) Committee 318. Minimum Design Load for Buildings and Other Structures (ASCE/SEI 7-02). American Society of Civil Engineers (ASCE). While the design, fabrication, and installation of the enclosure system is more complex when used as the building’s lateral-force-resisting system, which results in additional precast concrete costs, the costs are generally less than the subsequent savings in the structural frame costs. Compared with traditional methods of lateral force resistance systems, the savings in structural steel resulting from the use of the enclosure system as the lateral-force-resisting system can be significant.
#Ufc 3 310 04 update#
Between the time that UFC 1-200-01 is updated to adopt IBC 2006 and the time the formal update of UFC 3-310-04 is released, the provisions of this UFC will be in effect. This paper presents an innovative method of using a building’s enclosure system of precast concrete panels as the lateral-force-resisting system for a steel framed structure. UFC 3-310-04 will be updated, as soon thereafter as practical, to also utilize the IBC 2006 as the basic seismic design standard with DoD-specific modifications.
#Ufc 3 310 04 full#
CooperĬlick here to access the full journal article Abstract These Unified Facilities Criteria (UFC) provide technical guidance for the earthquake resistant (seismic) design of new buildings, and nonstructural. Paul Hobelmann, Macarena Schachter, Matthew C.
![ufc 3-310-04 ufc 3-310-04](https://images-na.ssl-images-amazon.com/images/I/71oDV-lk7nL.jpg)
UFC 1-300-08, Process for the Transfer and Acceptance of Real Property. Title: Architectural precast concrete panel systems used for lateral-force resistanceĪuthor(s): J. In the last few years, I was involved in implementing a series of updates to the Unified Facilities Criteria (UFC) 3-310-04 Seismic Design of Buildings. UFC 1-200-01, General Building Requirements.